GO Hardstand, Leachate Pond & Road Network
CLIENT
Eastern Metropolitan Regional Council
LOCATION
Red Hill, WA
STATUS
Completed
COMPLETION
Red Hill, WA
PCH Civil delivered the construction of the GO Hardstand, Leachate Pond and Road Network at the Red Hill Waste Management Facility for the Eastern Metropolitan Regional Council.
The scope included:
Site preparation including clearing, bulk earthworks and subgrade preparation
GO Hardstand construction including excavation, ferricrete sub-base and base, primerseal and 40mm PMB asphalt surfacing over 18,000m²
Leachate Pond construction including excavation, HDPE geomembrane liner installation, geotextile, anchor trenches and associated infrastructure
Road Network construction including internal access roads, subgrade preparation, sub-base, basecourse and tie-ins to existing network
Installation of leachate and stormwater drainage including swales, culverts, HDPE pipework, headwalls and outlets
Installation of perimeter fencing, access gates and safety infrastructure
Survey control, QA testing and compliance documentation