GO Hardstand, Leachate Pond & Road Network

CLIENT

Eastern Metropolitan Regional Council

LOCATION

Red Hill, WA

STATUS

Completed

COMPLETION

Red Hill, WA

PCH Civil delivered the construction of the GO Hardstand, Leachate Pond and Road Network at the Red Hill Waste Management Facility for the Eastern Metropolitan Regional Council.


The scope included:


  • Site preparation including clearing, bulk earthworks and subgrade preparation

  • GO Hardstand construction including excavation, ferricrete sub-base and base, primerseal and 40mm PMB asphalt surfacing over 18,000m²

  • Leachate Pond construction including excavation, HDPE geomembrane liner installation, geotextile, anchor trenches and associated infrastructure

  • Road Network construction including internal access roads, subgrade preparation, sub-base, basecourse and tie-ins to existing network

  • Installation of leachate and stormwater drainage including swales, culverts, HDPE pipework, headwalls and outlets

  • Installation of perimeter fencing, access gates and safety infrastructure

  • Survey control, QA testing and compliance documentation