Len Packham Sporting Reserve Upgrade
City of Cockburn

PCH Civil delivered the Len Packham Sporting Reserve Upgrade for the City of Cockburn, transforming the reserve into a modern multi-use sporting facility.
Site preparation and demolition of existing turf, paving, surfacing, asphalt, basecourse and fencing
Bulk earthworks and subgrade preparation
Limestone pavement, concrete paving, barrier kerbs and asphalt surfacing
Installation of stormwater drainage including gully pits, soak wells and PVC pipework
New acrylic sports surfaces and court line marking
Supply and installation of tennis and pickleball infrastructure
Installation of new 3.6m high mesh fencing and pedestrian gates
Floodlighting upgrade including new poles, luminaires, distribution board and conduits
Installation of CCTV, communications and the ‘Book-A-Court’ system with smart lighting controls
Irrigation modifications, verge reinstatement and turf remediation